Darwin

Key trends

Summary: Darwin’s market conditions will continue to fluctuate with the defence and resources pipelines. The nature of these sectors makes a consistent flow of projects difficult, so attracting and retaining trades will remain a challenge and cost pressures will generally remain higher than elsewhere. Escalation is forecast to average 4.9% p.a. for building and 5.0% p.a. for infrastructure from 2027 to 2029.

Competition for resources: Darwin’s market for trades relies heavily on interstate and overseas workers, particularly for major projects. This becomes more challenging when demand is elevated in other markets and can affect both resources and defence projects.

Cost escalation
2026
2027
2028
2029
Escalation type
BAU
BAU
Total
Total
Building
4.9%
4.6%
5.0%
5.3%
Infrastructure
4.6%
4.3%
4.3%
6.5%

Local insights

• The Northern Territory construction pipeline is typically overly reliant on defence and resources investment. While the defence project pipeline is slated to see a strong uplift, this pipeline is over the next decade and hence cannot underpin efforts to scale up local capability to a critical mass. Resources investment can also be significant but is even less able to be scheduled, and the territory government’s capex plans, while regular and scheduled, are too small to attract and retain industry. This means cost pressures will always be somewhat higher than in most other markets.

• Recent developments in the potential project pipeline suggest an elevated risk of stronger cost pressures in Darwin than in other markets. This risk would substantially increase should the proposed massive data centre (with Beetaloo Basin gas as the feedstock) proceed. However, should one or both proposed prison projects proceed, these would also be substantial projects for Darwin. Importing workers from major markets may prove difficult if those markets are also strengthening, which emphasises the benefits of increased and/or more regular construction in the NT.

Contact us

Jack Shelley, State Director jshelley@wtpartnership.com.au